Shower Panel Installation and Maintenance

Installation of the panels is easy and fast, so costs and timing can be calculated in advance. All of the assembly and fitting work is carried out on our production line, making the pre-plumbed shower panel a very economical option.

The shower panels are surface mounted, allowing easy maintenance access to all of the essential components. Low level isolating servicing valves on the sides of the panels allow for fast and simple servicing procedures.  Therefore the shower can operate reliably and safely during a maximised lifespan.

The integral water saving features ensure that the shower panels are included on the Water Technology List managed by the Department for Environment, Food and Rural Affairs.
 

Useful Documents

Shower Panel Specification Manual
PDF1885 KB
TSV1-3 Dual Control Shower Panel Instructions
PDF432 KB
TSV-TFC Shower Panel Instructions
PDF349 KB
H15-TFC Shower Panel Instructions
PDF857 KB
Group Shower Panel Instructions
PDF274 KB
Sports Shower Panel Instructions
PDF163 KB